Planning an engineered timber floor means coordinating joists, beams, connections and subfloor sheeting with the project design. For merchants and frame and truss businesses supporting builders, bringing these elements together early helps clarify the supply package, plan service penetrations and reduce cutting on site.
Dindas Australia brings together engineered timber products, design support and machining services for floor-system supply. DindasJoists can be cut to length and machined with planned service penetrations, while LVL beams can also be cut to length. Coordinating these requirements with the layout helps prepare the package before delivery.

Bring the floor components together
Start with the current architectural and structural drawings, support locations and intended floor build-up. These establish the requirements for the floor-system discussion and help identify details that are still unresolved.
The Dindas range includes DindasJoist engineered I-joists, LVL members, structural subfloor sheeting and related accessories. Hangers, rimboard, web stiffeners and other specified components should be considered within the project design. Confirm the selected products and quotation inclusions; accessory availability varies by state.
Connect product supply with design support
The Dindas Design Centre supports registered customers with engineered timber design, take-offs and project documentation. Depending on the project scope, support can include layouts, itemised bills of materials and 3D construction details. Agree the required outputs and design responsibilities at the start.
An itemised material list helps the merchant relate the quotation to the floor layout and identify components requiring separate supply. Coordinate the cutting list and service-hole layout with the current design before machining is scheduled.

Reduce site cutting with pre-cut members and service holes
Dindas Australia offers pre-cut service penetrations in DindasJoist webs, along with square-docked and labelled I-joists. DindasJoists and LVL beams can also be supplied cut to the required lengths. Preparing these components before delivery can reduce site cutting and help installers identify members for the floor layout.
Provide the required member lengths and proposed plumbing, electrical and air-conditioning routes while the floor layout is being developed. Hole sizes and positions must follow the relevant DindasJoist guidance and project design. Confirm the cutting list and service-hole layout before machining, along with availability, lead times and quotation inclusions for your project.

Give installers a clear connection to the design
DindasJoist uses colour-coded member identification matched to installation drawings, helping site teams relate supplied joists to their intended positions. Dindas Design Suite and isView support layouts and site interpretation, including QR-linked 3D access where provided.
Agree which drawings, installation details and product documents will accompany the package. Make sure the merchant and builder receive the current revisions so the installation team can work from the same information.
Keep the supplied system aligned with the documentation
Confirm the complete supply scope, delivery timing and any design-documentation conditions before ordering. If a member, connector or another specified component needs to change, refer the proposal back for review before supply or installation.
Any design certification applies to its documented scope and conditions. Ask Dindas which documentation is available for the proposed system and supply arrangement, rather than assuming it covers a revised or partly supplied package.
Discuss a floor-system package with Dindas
Merchants and frame and truss customers can send Dindas Australia current drawings, the project location, proposed floor build-up and required timing. Include cut-to-length and service-hole requirements in the enquiry. Builders can involve their supplying merchant so design, machining and supply are discussed together.